550 - 9/04/04 - 22:42
|
551 - 9/04/04 - 22:45
|
552 - 9/04/04 - 22:48
|
553 - 9/04/04 - 22:48
|
554 - 9/04/04 - 22:49
|
555 - 9/04/04 - 22:52
|
556 - 9/05/04 - 17:17
|
557 - 9/05/04 - 17:18
|
558 - 9/05/04 - 17:22
|
559 - 9/05/04 - 17:35
|
560 - 9/05/04 - 17:42
|
561 - 9/05/04 - 17:43
|
562 - 9/05/04 - 17:44
|
563 - 9/05/04 - 17:50
|
564 - 9/05/04 - 17:53
|
565 - 9/05/04 - 17:53
Enlarged view.
|
566 - 9/05/04 - 17:55
|
567 - 9/05/04 - 18:01
|
568 - 9/05/04 - 18:02
|
569 - 9/05/04 - 18:19
Cropped view.
Working on the B leg guy wire first.
|
570 - 9/05/04 - 18:26
Cropped view.
But, it took a long time, as they were having trouble getting the
pin loose as well as the grease on the gut wire causing problems.
|
571 - 9/05/04 - 18:55
Cropped view.
The station had all of the guy wires greased in order to add
protection against corrosion.
That made it difficult to attach to it.
|
572 - 9/05/04 - 19:10
Cropped view.
|
573 - 9/05/04 - 19:21
|
574 - 9/05/04 - 20:52
An overall tower shot, with the clouds in the background.
You can see the B and C leg guy wires.
|
575 - 9/05/04 - 21:05
Cropped view.
Finally, after coming down and getting stuff and having a
sledge hammer sent up, they got the guy wire loose.
|
576 - 9/05/04 - 21:06
Cropped view.
|
577 - 9/05/04 - 21:12
Cropped view.
|
578 - 9/05/04 - 21:13
Cropped view.
|
579 - 9/05/04 - 21:15
Cropped view.
They are now moving the guy wire down a couple of sections.
|
580 - 9/05/04 - 21:18
Cropped view.
|
581 - 9/05/04 - 21:26
Cropped view.
The guy wire is now temporarily connected to the tower.
|
582 - 9/05/04 - 21:30
Cropped view.
The lift cable is being raised back up in order to do the A leg.
|
583 - 9/05/04 - 21:49
|
584 - 9/05/04 - 21:50
|
585 - 9/05/04 - 21:50
|
586 - 9/05/04 - 21:51
|
587 - 9/05/04 - 21:54
|
588 - 9/05/04 - 21:54
Enlarged view.
|
589 - 9/05/04 - 22:08
Cropped view.
The C leg guy wire is now being moved down.
|
590 - 9/05/04 - 22:12
Cropped view.
The A and C leg guy wires came off a lot easier than the B leg guy wire.
|
591 - 9/05/04 - 22:18
Cropped view.
|
592 - 9/05/04 - 22:21
Cropped view.
|
593 - 9/05/04 - 22:23
Cropped view.
|
594 - 9/05/04 - 22:40
Cropped view.
They are now getting ready to lower the top section of the tower.
|
595 - 9/05/04 - 22:52
Cropped view.
But, because the work day has ended, the most that can be done is
to connect the hoist wire to the top of the tower.
John was the first one to swing across in order to catch a ride on
one of the other lift cables.
|
596 - 9/05/04 - 22:53
Cropped view.
Beau was second to cross.
|
597 - 9/05/04 - 22:54
Cropped view.
And Stacy was the last to swing across.
|
598 - 9/05/04 - 23:02
Cropped view.
Coming down after the work day ends.
|
599 - 9/05/04 - 23:08
Beau and his girlfriend.
|
600 - 9/05/04 - 23:09
The work day is done.
|
Notes:
- There are up to six riggers working up in the tower.
- The very bottom section is 16' and is one foot AGL.
- The next six sections at the bottom are about 26.667'.
- Each remaining section is 20'.
- The T-bar is 11'.
- Currently scheduled date for antenna sticks to be installed: 8/1/04.
- The antennas will be hoisted into place.
- One of the copper signal feeders will carry channel 15.
The other copper feeder will carry a combined 19 and 32 (DTV).
The waveguide will carry channel 57.
- Original images are 2560x1920 - TIFF (5 Mpixel)
- Starting with the 6/15/04 images, they are 3264x2448 - TIFF
(8 Mpixel)
- Enlarged views are 720x540 cuts
- Blowup views are 360x270 cuts enlarged to 720x540
- The EXIF value for the time the shots were taken is CST, not CDT
- Starting with the 6/15/04 images, the EXIF value for the time
the shots were taken is GMT
|